Location Cost

2017-18

Gallalee Hall Reno. Rm 334-337 $72,537.15
Bevill Renovation of Rm 0027 $39,659.02
Bevill 0056 $32,320.75
FY17 Annual Campus Boiler Upgrades $245,022.80
FY17 Annual Building Envelope Restorations $182,500.31
FY17 Annual Campus Lighting $82,635.73
FY 2017 ACDP Elevator Controller Replacements $21,386.98
FY17 Annual Campus HVAC Controls Upgrade $193,140.41
ACDP FY17 Electrical Distribution Replacement $223,128.40
FY17 Annual Building Restorations $398,733.10
Rose Admin Renovations for Strategic Communications $125,731.59
Law School Chiller Replacement $129,374.92
Rose Admin Special Events Renov. $197,797.47
Reese Phifer Hall Renovation of Room 338 $94,910.92
SHC Reception Desk Renovation $40,477.57
Sidewalk Enhancements East of Rose $54,704.01
NERC Replace Transformer $27,259.06
CCHS University Medical Center Purchasing $22,741.89
SERC Rm 3022 Conversion to Lab $35,886.91
SHC Pharmacy Department $49,812.32
Brewer Porch Bldg. #132 Floor Project $67,708.55
Rose Administration Room 120 Renovation $27,986.10
Bryant Conference Center Registration Lobby $35,881.46
Gallalee Hall Tertiary Pump Installation $26,667.95
Rodgers Library Tertiary Pump Installation $21,657.16
Little Hall Mechanical Room Modifications $37,784.62
Nott Hall Tertiary Pump Installation $21,085.02
600 Building Suite C Renovation $28,954.06
Total $2,537,486

2016-17

West Campus & Gorgas Electrical Distribution $279,239
Bryant Denny Stadium Renovation to the Presidents Box $709,015
Mary Harmon Bryan Hall UPS Replacement $36,103
Bevill Hall Ctrl Thermal Hot Water $48,278
Shelby Hall Hot Water Sys $104,694
390 Tanglewood Drive Miscellaneous Renovations $96,250
Student Rec Center Repair Hot Water System $34,808
Bryant Res Hall HVAC Unit Rep-close $100,217
Bidgood Hall Room 231 Renovation $99,030
NERC Research Lab 1046 Modification $31,911
Rose Administration President's Board Room Renovation $30,155
Rose Admin. Renov. for the Office of the Counsel $39,156
NE Medical Building Wing C Roof Coating $55,977
Sewell Thomas Hall of Fame Fit Out Millwork $147,398
Manderson Landing Landscaping & Bollards $25,330
Elevator Safety Code Compliance Upgrades $127,809
Student Rec Ctr Pool Strainer Repl $51,992
Moody Music Building Chiller Replacement $89,299
Morgan Hall Storm Sewer Repair $36,674
Garland Hall Room 102 & 103 $43,754
Bevill Energy Bldg Air Compressor R $57,631
SHC Carpet and Paint $53,895
Rose Admin Lobby Conf Rm 151 $22,788
Total $2,321,405

2015-16

401 Queen City Avenue Renovation $752,440
Arboretum Building Renovation $50,104
Bryant Conference Center Sellers Lobby $52,634
Capital Hall (Community Affairs) Phase 2 $303,897
Capstone College of Nursing Breakroom $30,171
Clark Hall Replacement of Fan Coils $32,216
Friedman Hall Chiller Replacement $64,576
Hardaway 255 & 256 Classroom $252,703
Hardaway Hall Rooms 164, 165A, & 165B $160,534
Jessup Building $188,156
Law Center Elevator Repair of Hydraulic Lines $37,560
Martha Parham West First Floor Miscellaneous Finish $62,783
Nott Hall Renovation of Rooms 281 & 282 $117,290
Reese Phifer 336 Renovation Teaching Lab $65,379
Reese Phifer Replace three 500KVA MV Trans $43,492
Reese Phifer Renovation Room 341 $79,460
Rose Admin. Renovation of Interior Office $118,121
Rose Admin. Renovation of Miscellaneous Rooms $32,577
Rose Admin. Renovation of Provost Area Conference Room $95,639
Rose Admin. Interior Renovation of Rooms 365A & 365B $26,729
Shelby Hall Air Compressor Replacement $50,781
Student Health Center Lobby $32,062
Total $2,649,304

2014-15

1818 University Blvd. Renovation $76,756
Barnwell Hall Chiller Replacement $40,528
BB Comer ELI Classrooms Painting & Flooring $43,061
Bidgood Hall 201 $29,248
Bidgood Hall Renovation of Room 304 and 004 $113,298
Carmichael Hall Rotunda Rm. 311 Sound Mitigation and Remodel $25,882
Garland Hall 301 & 302 Renovation to Faculty Offices $21,942
Gordon Palmer Landscape and Irrigation $45,701
Hardaway Hall Research Lab Rm. 111 & 112 $33,881
Mary Burke East Office 132 Modification $24,016
Mary Harmon Bryant Repair of York Chiller $28,793
Math Office Renovation of GP Room 345 $34,747
McLure Library Rooftop Air Handler Replacement $37,117
Paty Hall Renovation of Room 102 $22,470
Phi Kappa Psi Installation of Stairwell $27,300
Re-Configure and replace Existing Sidewalks $84,957
Reese Phifer Cooling Tower Replacement $38,977
Reese Phifer Hall Classroom 226 $29,022
Rose Admin. Renovation of the Office of Financial Affairs $363,317
Rose Administration Basement $122,746
Rose Administration Conference Room 303H $29,085
Rose Administration Interior Renovation Room 201/202 $56,295
Rose Administration Interior Renovation of Academic Affairs Office Space $21,404
School of Medicine Rooftop AHU Replacement $93,043
Shelby Hall Boiler Number 2 Repair $30,744
Suite A 600 University Blvd. East Interior Renovation for Public Safety $121,238
University Medical Center New Chiller Installation $184,670
Total $1,780,241

2013-14

University Blvd Security Fence $322,631
Smith Hall Renovation of Room 200 $83,342
Law Center Sidewalk and Fencing $48,931
Misc.. Campus Infrastructure Projects $211,523
Rose Admin Electrical Switchgear Replacement $94,128
Renovation of Former Sigma Chi House $115,809
Moody Music Compressor Replacement $19,065
Mary Harmon Bryant Repair of 100 HP Boiler $47,663
Rose Administration Renovation of Room G72 $17,514
Moody Music & 2nd Ave Pedestrian Walkway $15,605
Relocation of Bevill Chiller to AIME $51,230
Misc. Improvements to Denny Chimes Area $13,726
Athletic Central Energy Plant Repairs $35,695
McMillian Building - Boiler Replacement $72,601
HM Comer Heat Exchanger Replacement $37,791
Clark Hall Reno of 1st Floor Bathrooms $41,066
Jones Archaeological Museum Replacement of RTU $10,378
Law Center Elevator Repairs $49,993
Rose Administration Tenant Improvements $94,369
Shelby Energy Landscape/Parking Lot Enhancements $13,436
UA Banner Replacement $14,806
Hackberry Park Enhancement $132,716
Renovation of Room 332 Reese Phifer $28,291
Osband Hall Renovation of 1st Floor and Break Room $14,008
Total $1,586,315

2012-2013

2010 Handicap Accessibility Upgrade $400,144
BB Comer, Morgan Hall, Rowand Johnson, ten Hoor Multi-Media Suites $34,801
Bicycle Rack Installation $148,200
Bidgood Hall Reconfigure Room 103 $15,776
Bidgood Hall Reconfigure Room 104 $44,004
Bryant Museum Renovation to Exhibits $44,180
FY13 Annual Bldg. Envelop Restoration $292,251
Law Center - Classroom Renovation $432,257
Mixed Use Trail at Sam Bailey Track $42,130
Phi Kappa Psi-Install of Stairwell $24,709
Renovation ACT Space for Student Receivables $338,045
Rose Admin Tenant Improvement Office of University Counselor $29,825
University Medical Center Compressor $19,279
Total $1,865,601

2011-12

Buildings Around Quad Up Lighting $21,170
Annual Campus Lighting $19,702
Doster 1st Floor Ceiling Tile $23,979
Martha Parham Carpet Replacement $30,177
Gorgas House Landscaping Improvements $29,934
Temporary Chillers-C&BA Energy Plant $1,306,148
University Club Boiler & Misc. Repairs $74,545
Capstone Village GH 684 $47,270
Aquatic Center Mechanical Piping Women $20,303
Hillel House Renovation for Community $57,000
Doster Hall Room 304 Renovation $34,710
Modernize HVAC Controls $74,520
Rose Administration Exterior Restorations $59,105
Bevill Building Replace RTU Clean Room $76,668
Nott Hall Annex Window Replacement $44,094
Farrah Hall Geography Office Suite $19,841
Rose Administration G69/G303 Improvements $30,128
Moody Music Building Boiler Repair $119,005
Facilities Administration Chiller Replacement $72,481
Bryant Conference Center Boiler Repairs $20,526
Capstone Village Garden Center $40,370
Law Center Sidewalk and Fencing $22,193
Bryant Drive Supe Store Renovations $33,980
Bryant Conference Center Chiller $69,850
Harris Hall Chiller Replacement $49,358
Doster Hall Envelope Restoration $53,690
Total $2,450,747

2010-11

700 University Boulevard East $34,067
Alumni Hall Landscaping & Signage $10,836
Ancillary Services Building (Convert Workroom to Office Suite) $21,893
Ancillary Services Building (Suite 102 Build out) $52,288
BB Comer Window Replacement $42,361
Bryant Museum Display Cases $28,378
Capstone Village Upgrades 600 $32,680
Capstone Village Upgrades 605 $24,988
Capstone Village Upgrades 607 $29,484
Capstone Village Upgrades 608 $5,000
Capstone Village Upgrades 610 $10,339
Capstone Village Upgrades 615 $29,529
Capstone Village Upgrades 679 $29,162
Doster Hall 108 Kitchen Modification $14,126
Gordon Palmer Room 301/302 Finishes $23,864
Gorgas Library Chiller Replacement $199,358
Gorgas Library Resource Center/Emerging Technologies $81,435
Gorgas Library Room 542 Renovation $27,110
KA-PKA Green Space Improvements $87,997
Little Hall 1st Floor Restroom $51,937
Marr's Pond Cistern Renovation $55,520
Martha Parham A/V Classrooms $66,196
New Hall Redundancy in Dispatch $129,075
Nott Hall Boiler Upgrade $22,453
President's Mansion 3rd Floor HVAC $102,451
Quad Security Cameras $28,568
Quad Up Lighting $77,483
Rose Administration Building Re-configure for Advancement $64,364
Smith Hall Restoration $199,358
Student Service Center, Room 206 $35,735
Tutwiler Hall Community Directors Suite Exterior Door Security $23,851
Tutwiler Hall Community Directors Suite $140,946
Woods Hall Room 209 Renovation $51,688
Total $1,834,520

2009-10

Bidgood Hall Paint Corridors $31,640
Campus Sidewalk Repair $250,000
Ferguson Center Additional Bicycle Racks $49,520
Galilee Hall Restroom Renovations $61,000
Gallalee Hall Finish Upgrades $87,000
Gordon Palmer Rooftop Chiller Replacement $290,000
Gorgas Library 5th Floor Finishes $36,769
Gorgas Library Chiller Replacement $200,000
Gorgas Library Resource Center $102,582
Hardaway Hall Chiller Replacement $229,050
Heat Plant Boiler Burner Controls $171,962
Little Hall 1st Floor Restroom Renovation $35,000
Mal Moore Athletic Building (Heisman Trophy) $58,000
Manly Hall Misc. Room Renovations $31,106
Marr's Pond Repair Cistern $57,000
Mary Burke Upgrade Chilled Water $39,200
New Hall Building Envelope Refurbish $31,700
Nott Hall Boiler Upgrade $85,093
President's Mansion Chiller Replace $45,413
Smith Hall Restroom Renovation $200,700
Tutwiler Hall - Julia C Store Addition $39,200
Woods Hall Room 209 Renovation $74,766
Total $2,206,701

2008-09

Campus Bollards $84,510
Ferguson Game Room Renovation $191,735
Gorgas Library Computer/Testing Service $118,352
Priority A Landscape Project $177,139
Total $571,736
Ten-Year Total $19,804,057
Source: Building Information Services