2018-19
|
4th St East MV Upgrades 2016 |
$787,746 |
ACDP FY18 Rowand Johnson Swithcgear Replacement |
$242,426 |
ACDP FY18 University Club Chiller Replacement |
$128,470 |
Alpha Delta Pi Sorority Modification to Food Servery |
$349,811 |
Alpha Gamma Delta Kitchen & Den Expansion |
$3,807,277 |
BDS East Skybox HVAC Renovation - Phase III |
$241,691 |
BDS Field Lighting Deferred Maint |
$1,185,728 |
Bidgood 249 Behavioral Lab |
$495,916 |
Biology Bldg. Auditorium Renovation |
$493,433 |
Bryant Conference Center Birmingham-Central Room |
$383,982 |
Bryant Conference Center Seller Auditorium Lighting Upgrade |
$590,481 |
Campus Wide Install Power/Fiber |
$836,473 |
Campus-Verizon Wireless Campus Buildout |
$405,927 |
Capital Hall 1st FI NE Wing Additional Labs |
$202,321 |
Capital Hall 2nd Floor Renovation for Title IX |
$351,309 |
Capital Hall Additional Office Common Space |
$284,402 |
Capital Hall CCE Area Renovation |
$768,521 |
Capital Hall Elevator Upgrades |
$236,470 |
Capital Hall Fire Alarm Panel Upgrade |
$335,748 |
Civil Issue in Front of Clark |
Garland |
Colonial Dr Water Line Improv |
$664,775 |
Cyber Hall 3rd Floor FF&E |
$1,089,327 |
Delta Sigma Phi Repairs |
$93,833 |
EHS -Cottage 7 Renovation |
$1,999,823 |
Ferguson Parking Deck Coating |
$535,869 |
Ferguson Student Center Theater Renovation |
$1,187,081 |
Freshman Res C Store Fit Out |
$526,601 |
FY18 Campus Wide St. & Parking Lot Repairs |
$572,480 |
Garland Hall 205 Renovation |
$83,153 |
Hillel Student Activity Center Addition |
$749,434 |
Human Resources Furniture Package |
$489,014 |
Lakeside Dining Dish Machine |
$528,520 |
Latham Building Renovation |
$2,497,802 |
Latham Training Center Furniture Package |
$307,604 |
Law School Electrical Riser Reconstruction |
$239,840 |
Law School Rooms 187 & 188 |
$193,228 |
Martha Parham & Mary Burke CTE Service |
$165,050 |
McMillan Rm Renovation |
$333,224 |
Morgan Hall 2 Pipe Conversion |
$3,351,669 |
Northeast Medical Building Suites & Lab Renovation |
$220,595 |
OIT & EHS Parking Lot |
$268,028 |
Parking Lot Enhancements at HR at Partlow |
$453,740 |
Partlow Central Energy Plant for HR |
$596,909 |
Partlow Cottage 5 Renv for OIT |
$1,344,927 |
Partlow Cottage 8 Renovation for Swing Space |
$731,092 |
Partlow Medium Voltage Elect Srv Up |
$601,705 |
Paty Residence Hall Renovation |
$12,781,750 |
Paty Hall Abatement |
$367,866 |
Peter Bryce Campus Bldg Demolition |
$3,630,701 |
Reese Phifer Hall Rooms 117A-D and 118 |
$345,910 |
Renv for F&D of Cottage 3 Partlow |
$2,430,163 |
Ridgecrest South Interior Paint & Hallway Carpet Riverside West EFIS Repair |
$1,233,495 |
Riverside West EFIS Repair |
$231,265 |
Rodgers Library Fire Alarm System Upgrade SERC Combustion Lab Compressor |
$129,276 |
SERC Combustion Lab Compressor |
$78,146 |
Sewell Thomas Stadium COE PV Array |
$147,482 |
Smith Hall 120-122 |
$206,536 |
Streetscape Improvements on Colonial Dr. |
$292,053 |
Student Rec BARA Improvements |
$497,093 |
The Cube at HM Comer Hall |
$252,865 |
UMC D201 Renovation & Conversion of Space |
$355,220 |
Univ Service Campus Fleet Pkg Lot |
$553,791 |
Univ Service Campus Sanitary Sewer |
$289,340 |
Univ Services Campus Water Lines |
$483,896 |
University Blvd. Improvements Installation of Conduit for Fiber University Hall Renovation |
$230,552 |
University Hall Renovation |
$26,743,255 |
University Medical Center |
$77,767 |
University Town Center Security Cameras |
$113,968 |
Total |
$83,708,273 |
2017-18
|
Frank Moody Music Add & Ext Renv |
$13,998,336.46 |
Transportation Services Relocation |
$7,143,745.19 |
Cyber Hall Renovation of 3rd Floor |
$2,709,258.56 |
Sigma Phi Epsilon Renv & Addition |
$5,122,517.64 |
HM Comer Design & Construction of M |
$24,173,498.39 |
Colonial Dr. Utilities & Infrastructure Ph II |
$1,673,895.25 |
Partlow Admin Bldg 1001 Renv |
$5,371,526.57 |
Bryant Denny East Skybox HVAC Replacement Phase II |
$279,206.02 |
Riverside East HRC Exterior Repairs |
$252,101.28 |
SOM G101 Renovation |
$657,305.30 |
AIME 221 & 222 Hood Installations |
$159,526.05 |
Russell Hall 3rd Fl Renv of Ctr for |
$2,478,934.03 |
Bryant Conf Ctr Sellers Auditorium |
$984,208.14 |
BDS East Tower Elevators Renovation |
$897,197.02 |
Bryce Campus Utility Enhancements |
$181,614.72 |
Alpha Tau Omega Kitchen Renv & Ext |
$211,840.53 |
Mal Moore Athletic Facility Recruit |
$2,046,674.55 |
President's Mansion Back Patio |
$377,567.13 |
Graduate Hall Exterior Stabilization |
$591,432.96 |
Clark Hall Renovation of Rear Entrance |
$314,602.45 |
Lakeside Dining Renovation |
$6,690,462.52 |
Capital Hall Renovation for Relocation of Plank Center |
$1,344,215.14 |
Reese Phifer Hall 101-105C - Career Services |
$320,100.85 |
Gorgas Library/Admin Suite Refurbishment/C211, 201, 201A-I |
$242,813.25 |
WOW Program Renovations |
$187,581.41 |
342 Gordon Palmer Hall |
$70,614.78 |
Doster Hall/ New Office/ 2nd Floor |
$157,860.35 |
Prog for Division of Strategic Comm |
$360,810.65 |
FY18 Annual Campus Elevator Upgrade |
$147,612.40 |
FY18 Annual Campus HVAC Controls Up |
$245,150.54 |
FY18 Annual Building Restorations |
$307,782.63 |
ACDP FY18 Annual Bldg Envelope Rest |
$199,184.83 |
Garland 208 Renovation |
$48,076.55 |
NOAA Weather Ctr Modifications |
$159,926.00 |
Biology Bldg Cooling Tower |
$150,674.86 |
Rose Admin Office 157 and 152 |
$357,997.68 |
Capstone Village Impr Proj Option B |
$380,420.75 |
Alston 1st Fl MGT & MKT Space Recon |
$64,843.02 |
Capital Hall Chiller Replacement |
$176,405.58 |
Parking Services Breakroom Reconfig |
$42,925.87 |
Doster Hall Install BAS |
$35,075.34 |
Clark Hall 102 Office Ste Renv |
$81,075.12 |
Bevill Domestic Water Heater |
$29,567.00 |
RISE Ctr Classroom 123 Renovation |
$23,999.95 |
Strength & Conditioning Facility NF |
$75,048.94 |
Riverside East HRC Interior Repaint |
$221,565.63 |
Riverside West HRC Interior Repaint |
$230,019.56 |
Riverside North HRC Interior Repaint |
$268,531.04 |
Lakeside West HRC Interior Repaint |
$295,656.62 |
Lakeside East HRC Interior Repaint |
$235,508.96 |
Alston Hall 468 & 469 Renovation |
$164,125.12 |
South Lawn Office Building |
$309,594.80 |
Delta Kappa Epsilon Renovation of House Director's Suite |
$143,179.01 |
Bryant Conference Center Miscellaneous Renovation |
$40,683.72 |
The Bama Zone |
$186,750.66 |
Pinehurst #9 Interior/Exterior Renv |
$209,336.19 |
Biology Bldg. New Data Closet |
$100,067.04 |
Ridgecrest S Outside Air System Rep |
$2,141,809.52 |
Bryce Lawn Dr. 500 |
$196,058.75 |
Bryce Lawn Dr. 508 |
$192,641.13 |
Bryce Lawn 511 |
$83,761.27 |
Blount Hall Common Area Paint & Carpet |
$116,329.85 |
Bryce Lawn 601 |
$83,761.28 |
Bryce Lawn 607 |
$83,762.69 |
Bryce Lawn 422 |
$193,383.81 |
Bryce Lawn 423 |
$193,374.42 |
Total |
$87,215,115 |
2016-17
|
Little Hall Renovation |
$9,672,172 |
Procurement Services Renovation |
$3,665,351 |
East Quad Energy Plant Install Boiler |
$821,888 |
Brewer Porch Lobby & Entrance Upgrade |
$319,901 |
President's Mansion Front Lawn and new Porte Cochere |
$471,149 |
Cyber Hall Renovation Old Cafeteria Space |
$419,455 |
Capital Hall Replacement Boiler |
$602,017 |
Capital Hall Ethics & Social Responsibility Center |
$609,652 |
Capital Hall Renovation for College of Education |
$527,792 |
Gorgas Library Study Room 200 |
$677,227 |
NE Medical Building HVAC & Boiler Replacement |
$299,763 |
Southwest Utility & Infrastructure Phase 1 |
$1,569,575 |
Partlow Campus Civil Improvements |
$858,795 |
Ferguson Center Loading Dock Modifications |
$383,278 |
Adams Hall Renovation of 3rd Floor |
$235,582 |
Bryce Campus Structural Fill & Utilities |
$613,771 |
Fresh Food 2nd Floor Enterprise Operations Office |
$747,928 |
NE Commuter Parking Lot Expansion |
$2,289,103 |
Mary Burke Hall East |
$829,718 |
Reese Phifer Dean's Office Ste 201 |
$411,746 |
Russell Hall First Floor Renovation for CHES |
$1,497,417 |
Doster Hall Window Repairs / Fan Coil |
$819,403 |
Paty Hall Interior Renovation of Lounge Area |
$369,442 |
Moody Music Restroom ADA and Finish Enhancements |
$658,394 |
Gorgas Library SLIS 5th Floor Renovation |
$548,421 |
Paty Hall Engineering Enginuity Lab |
$209,183 |
Condenser Piping Repairs at Presidential Village |
$33,801 |
Paty Hall Lobby Renovations |
$34,900 |
Riverside Common HRC Exterior Repairs |
$41,567 |
Tutwiler Hall Lobby Renovations |
$193,683 |
University Domestic Water System Resiliency Study |
$41,520 |
Capstone Village Garden Home |
$25,991 |
Capstone Village Apt. 328 |
$22,252 |
Ridgecrest South Traffic Coating Repairs |
$25,489 |
Reese Phifer Hall Renovation Rm 222 |
$73,590 |
Ferguson Center SGA Room 2605 |
$43,323 |
Barnwell Hall Sidewalk Enhancements |
$32,787 |
Total |
$30,697,027 |
2015-16
|
ASB 1st & 2nd Floor Renovation |
$120,603 |
Barnes Center Install Air Cooled Chiller |
$368,839 |
Barnwell Sidewalk & Light Pole Proj |
$131,612 |
Bidgood 340 Classroom Upgrade |
$317,038 |
Bidgood Hall Experiential Learning |
$632,549 |
Bryant Conf Ctr Renv & Add Programm |
$110,003 |
Bryant Conference Center Restrooms |
$239,416 |
Bryant Conference Ctr-Rast Room |
$205,351 |
Bryant Dr Street Lighting Upgrade |
$194,211 |
Bryce Apt. Bldg. 379 Inteior Renov. |
$184,963 |
Bryce Lawn Apt. Bldg. 380 Interior Renov. |
$194,707 |
Bureau of Mines #4 Relocation of Moody Art Collection |
$978,979 |
Business Activities Building |
$3,065,080 |
Campus Wide Rd/Crosswalk Re-stripe |
$110,038 |
Capital Hall General Building Misc. Renovation |
$133,375 |
Capital Hall OIT Service |
$333,447 |
Capital Hall Renv for Swing Space |
$515,447 |
Capstone Ctr for Student Success |
$640,973 |
Capstone Village Tradition's Way Common Renovation |
$115,265 |
Central Control Building Outdoor Fields Complex Renov. |
$167,379 |
Constr of Plan Rm Archival Storage |
$522,903 |
Farrah Hall Renv of Misc Rms 3rd Fl |
$408,839 |
Ferguson Center and Woods Hall Handicapped Parking Lot |
$331,820 |
Ferguson Center-Mechanical Upgrades |
$313,550 |
Ford Building Renovation |
$371,975 |
Hardaway Hall Programming Hall & Sc |
$121,829 |
Highlands on Hackberry Renovations |
$1,725,660 |
Law School Ceilings Hallways and Common Areas |
$305,889 |
Martha Parham W Int Renv 106/108 |
$161,887 |
Moody Music Fire Alarm Upgrade |
$451,475 |
Moundville River Bank Stabilization |
$291,777 |
NE Medical Building Quadrant C |
$1,260,373 |
NERC Various Equipment Connections |
$230,001 |
North Lawn Sidewalk & Lighting |
$429,359 |
Paty Hall Renovation for Student Lounge |
$128,199 |
Printing & Mail Services Building |
$12,144,034 |
Radio Tower at UAPD Headquarters |
$226,473 |
Reese Phifer Hall/Large Lecture/216 |
$189,547 |
Ridgecrest E.Carpet Replacement |
$127,489 |
Riverside N. Paint & Repair Synthet |
$431,036 |
SEC 3454 Conv Instructional Prepara |
$164,508 |
Sidewalk Repl Along Northside 2nd S |
$215,080 |
Student Services Center Orientation Renovation |
$210,528 |
Tanglewood Bio Station Prep for Mes |
$126,781 |
Univ Rec Outdoor Fields Complex Turf |
$196,611 |
Total |
$29,846,901 |
2014-15
|
Phi Sigma Kappa Renov. To the Old Theta Chi House |
$532,629 |
Reese Phifer Hall Classroom Lab 112 |
$326,939 |
Reese Phifer Hall Misc Interior Renovation |
$248,651 |
Riverside East Corridors and Lobby Flooring |
$144,502 |
Riverside Hardscape Install/Enhance |
$596,914 |
Riverside North Interior Corridors and Common Space |
$136,782 |
Riverside West Corridors and Lobby Flooring |
$145,915 |
SEC Lab Fit-Out |
$2,637,512 |
Sigma Alpha Epsilon |
$132,036 |
Sigma Nu Selective Renovations |
$229,949 |
Softball Complex Scoreboard Upgrade |
$463,232 |
South End Zone Former Yogurt Shop |
$104,278 |
Ten Hoor Hall Elevator Jack Replace |
$150,325 |
Tom Barnes Education Center |
$960,153 |
Tutwiler Hall Renovation Bathroom& Common Area |
$778,246 |
University Recreational Outdoor Fields Complex |
$176,433 |
Woods Hall Structural Repair |
$621,083 |
Total |
$68,079,383 |
2013-14
|
BDS & Col. Drive Secondary Power Feed |
$1,165,448 |
Bryant Conference Center Roof Replacement |
$392,765 |
Bryce Campus Water Distribution System Phase I |
$267,098 |
Bryce Chapel Deferred Maintenance |
$1,853,712 |
Central Campus Sewer Restorations Phase IV |
$283,272 |
Delta Chi Renovation |
$3,946,957 |
East Annex HVAC Replacement |
$993,044 |
Ferguson Center Renovation and Addition |
$44,391,962 |
HRC Office Fit-Out Inside Student Center at Presidential Village |
$337,139 |
Marta Parham Fire Alarm |
$368,525 |
Mary Burke Hall Corridor Renovation |
$599,753 |
Mary Burke Renov/Connv Buffalo Phil's |
$400,809 |
Palmer Hall Demolition |
$240,188 |
Paty Hall Renovation of Raising Canes |
$694,023 |
Reese Phifer Cooling Towers |
$32,444 |
Riverside Hardscape Enhancements |
$528,867 |
Riverside North Breezeway |
$947,700 |
Russell Hall Roof Replacement |
$247,256 |
SEC Quad Faáade Restoration |
$297,194 |
Shelby Hall Buildout of Rooms 2083 and 2089 |
$400,000 |
Student Media Renovations |
$194,409 |
Tutwiler Elevator Safety Repair |
$447,458 |
Woods Quad Thermal Energy Tie |
$1,266,795 |
Total |
$60,296,819 |
2012-13 |
Cost |
2012 Annual Parking Deck Repairs |
$977,559 |
809 Bryant Drive Demolition |
$38,055 |
Athletic Central Energy Plant Fit-out |
$646,915 |
AIME 239/240 Fit-up Design |
$202,909 |
Barnwell Lot Programming for Sorority |
$173,094 |
BB Comer Renovation |
$215,251 |
Bryant-Denny Stadium Renovation |
$956,843 |
Beta Theta Pi Back Porch Enclosure |
$324,970 |
Bevill 1051 Install DynaCool System |
$2,741 |
Mary Burke Dining Hall Renovation |
$2,170,994 |
Campus Drive Parking Deck Action Card & Transportation Services Offices |
$1,711,165 |
Campus Drive Parking Deck Renovation Dedicated Bus Lanes |
$282,519 |
Campus Electric Service to Traffic Signals Between Colonial Drive & Wallace Wade |
$256,831 |
Capstone Village 527 Tenant Finish |
$11,993 |
Clark Hall Roof Replacement |
$247,590 |
Coliseum Drive Landscaping |
$114,854 |
Crisp Indoor Practice Facility Deferred Maintenance |
$1,216,901 |
DE Jones Mound P Interpretive Area |
$65,422 |
Demolition of Kilgore House |
$63,535 |
Demolition of Phi Delta Theta and Student Media |
$237,162 |
Demolition of Delta Delta Delta |
$110,268 |
Doster Hall Kitchen to Food Science Lab |
$2,191,372 |
Doster Hall Lab to Design House Space |
$302,823 |
Doster Hall Misc. Renovation (2nd Floor) |
$92,139 |
East University Blvd Overhead Power Line Conversion |
$1,088,202 |
Farrah Hall 3 Stop Elevator Install |
$569,204 |
Ferguson Center Abatement |
$52,009 |
Ferguson Mail Center Renovations |
$664,247 |
Former Sigma Chi Fire Alarm System |
$118,724 |
Gordon Palmer Data Center Redundant Power |
$176,648 |
Highlands Commons Building Roof Repairs and Re-caulk |
$266,015 |
Lakeside Dining Outdoor Shelter |
$708,922 |
Law Center Renovations of 284 |
$149,359 |
Law Center Room 344 Renovation |
$127,208 |
Mal M Moore Athletic Facility 1st Floor Deferred Maintenance |
$7,975,287 |
Mal M Moore Athletic Facility 2nd Floor Deferred Maintenance |
$5,661 |
Mal M Moore Athletic Facility Furniture & Tech |
$276,724 |
MAP- Erskine Ramsay Archaeological Repository Addition |
$632,512 |
NOAA Hydronic Piping |
$909,121 |
Paty Hall Community Directors Suite |
$216,712 |
Paty Hall Mechanical System Upgrade |
$2,302,210 |
President's Mansion |
$277,526 |
Relocation Career Center - Bidgood |
$143,512 |
Riverside Pedestrian Bridge Replacement |
$738,970 |
Russell Hall 4th Floor Door Replacement |
$61,704 |
Russell Hall Auditorium Light Replacement |
$120,836 |
South Barnwell Medium Voltage Distribution Phase I |
$774,323 |
Track Stadium Renovation |
$4,197,462 |
Shelby Energy Plant Cooling Tower |
$193,100 |
Shelby Fountain and Site Improvements |
$1,869,096 |
Ten Hoor Hall Renovation |
$5,752,415 |
Tutwiler Hall Renovation 8th Floor Community Kitchen |
$16,603 |
Tutwiler Hall and Barnwell Hall Install Boilers |
$233,563 |
Univ. Blvd Bike Path Extension Phase III |
$926,270 |
Total |
$44,158,050 |
2011-12 |
Cost |
4th Street Electrical Distribution |
$625,871 |
8th Street Storm Water Improvements |
$1,020,319 |
Student Media Old Bryce Property |
$817,986 |
Student Media Old Bryce Property |
$239,062 |
Alpha Omicron Pi |
$2,168,082 |
Alston & Bidgood Subway Pavers |
$57,285 |
Athletic Complex Electrical Distribution Upgrade |
$392,137 |
Athletic Practice Fields Replace & Restore |
$3,461,550 |
BB Comer Exterior Restoration |
$2,438,035 |
BB Comer Renovation North Basement |
$571,045 |
Bidgood Hall Misc. Interior Renovation |
$120,517 |
Theatre & Dance Old Bryce Property |
$88,021 |
Environmental Health and Safety |
$136,006 |
Bureau of Mines Building #4 |
$79,743 |
Central Campus Electrical Distribution |
$668,221 |
Delta Sigma Phi |
$1,074,163 |
East Campus Perimeter Parking Lot |
$3,162,265 |
Farrah Hall Auditorium Classroom |
$1,224,516 |
Joint Engineering/Arts and Sciences Students Projects Building |
$1,598,257 |
Lakeside Dining Renovation Dunkin Donuts |
$279,621 |
Magnolia Drive Development |
$4,177,360 |
Mary Burke Window Replacement |
$392,938 |
Moore Hall Renovation |
$8,961,835 |
Parking Lot on Johnny Stallings Drive |
$565,995 |
Paty Hall Elevator Modernization |
$567,555 |
Paty Hall Misc. Renovation Fire Alarm |
$661,602 |
Rodgers Library 1st Floor Renovation |
$211,216 |
Russell Hall Renovation & Addition |
$15,843,147 |
South Core Campus Thermal Energy |
$780,123 |
Tanglewood Estate Classroom/Lab |
$367,682 |
Topio's Renovation - Ferguson 2nd Floor |
$214,089 |
Tutwiler Hall Restroom Renovations |
$66,948 |
Zeta Beta Tau |
$3,618,249 |
Total |
$56,651,441 |
2010-11 |
Cost |
Alston/Bidgood Food Service |
$1,437,528 |
BB Comer Computer Lab 252 |
$206,693 |
BB Comer Central Smokestack Demolition |
$207,977 |
Bryant Conference Center Landscaping |
$640,835 |
Carmichael Hall Exterior Repairs |
$310,131 |
Doster Hall CafÇ Renovation |
$230,125 |
Ferguson Center Student Organization Space |
$582,118 |
Gorgas House Exterior Repairs |
$1,047,762 |
North Substation |
$1,920,000 |
Sanitary Sewer Repairs Phase I |
$568,460 |
Softball Clubhouse |
$1,886,294 |
University Medical Center Addition |
$746,627 |
Total |
$9,784,550 |
2009-10 |
Cost |
Adams Hall Renovation |
$3,389,882 |
Alpha Kappa Lambda House |
$208,367 |
Bryant-Denny Stadium |
$884,535 |
Bryant-Denny Stadium Police Command Center |
$619,434 |
Bryant Conference Center Landscaping |
$693,074 |
Carmichael Exterior Repairs |
$310,131 |
Coleman Coliseum Basketball Office Renovation |
$4,504,462 |
Coleman Coliseum Scoreboards/Graphics |
$2,398,196 |
College Bookstore/Dance Studio |
$590,832 |
Ferguson Center Fire Alarm Upgrade |
$379,168 |
Ferguson Center Hall of Fame Student Organization Space |
$582,118 |
Ferguson Center Sprinkler Upgrade |
$384,905 |
Foster Auditorium Renovation |
$16,081,792 |
HM Comer Engineering Auditorium Renovation |
$306,661 |
Indoor Football Practice Facility Renovation |
$458,800 |
Jones Archaeology Museum Renovation |
$4,945,729 |
Kappa Alpha House Improvements |
$417,664 |
Law Center Generator Replacement |
$62,416 |
Lloyd Hall Renovation |
$16,339,349 |
Mal Moore Athletic Facility Renovation |
$1,324,807 |
Paty Hall Roof Replacement |
$408,169 |
Mary Burke West Elevator Cable & Control Replacement |
$505,632 |
Moody Music 2nd Floor Corridors & Lobby |
$205,812 |
Moundville Erskine Ramsey Addition |
$266,763 |
Sewell Thomas Stadium Upgrades |
$624,807 |
Sigma Pi Improvements |
$794,321 |
South Lawn Office Park Building |
$474,566 |
Tutwiler Building Envelope |
$436,175 |
Woods Hall HVAC Upgrade |
$655,000 |
Total |
$59,253,567 |
2008-09 |
Cost |
AIME Building Dr. Formby Test Chair |
$94,278 |
Bryant-Denny Stadium 2008 Waterproofing |
$277,793 |
Delta Tau Delta |
$2,339,527 |
Doster Hall 103A Carpet Replacement |
$51,208 |
Gordon Palmer Replace Annex Carpet |
$112,875 |
Gorgas Library Room 212 Renovations |
$155,619 |
Julia's C-Store Renovations |
$159,296 |
Lambda Chi Alpha |
$3,450,006 |
Law Center Classrooms 172,175 & 283 |
$422,780 |
Law School Re-Roof |
$1,339,122 |
Lloyd Hall Renovation |
$6,143,088 |
Mal Moore Athletic Facility |
$1,324,807 |
McLure Library Re-Roof |
$329,766 |
Rose Administration Purchasing Dept. |
$83,338 |
Smith Hall Re-Roof |
$799,961 |
South ten Hoor Parking Deck |
$209,028 |
Student Service Center Undergraduate Admissions |
$658,887 |
Total |
$17,951,379 |
Ten-Year Total |
$463,934,232 |