2018-19
|
ACDP FY18 Electrical Distribution Replacement |
$263,230 |
Alumni Hall Shingle Roof Replacement |
$51,785 |
Athletic Energy Plant Chiller #1 & #2 Rebuild |
$135,113 |
BB Comer Chiller Replacement |
$51,970 |
BOM #4 Astrobotics Lab |
$82,608 |
Campus Wide Cooling Towers Cleaning |
$147,078 |
Carmichael Hall Elevator Upgrades |
$100,262 |
Child Development & Research Center Flooring |
$100,291 |
Child Development Chiller Replacement |
$82,779 |
Cyber Hall Joint Electronic Crimes Task Force |
$211,811 |
Ferguson Center 3519 & 3510 |
$58,790 |
FY18 Annual Campus Boiler Upgrades |
$133,375 |
FY18 Annual Campus Lighting |
$102,156 |
FY19 Annual Campus Lighting |
$117,064 |
FY19 Emergency Generator Control Upgrades |
$121,018 |
Gorgas Library Office Reovation |
$59,269 |
Houser Hall 2017-2020 Suite Renovation |
$91,805 |
MAP Jones Museum Roof Replacement |
$72,337 |
Martha Parham Chiller Compressor Replacement |
$53,349 |
Renovation of Medical Recoreds in the NE Section |
$141,676 |
Rose Admin Room 318 Suite |
$69,038 |
Rose Administration 2nd Floor Door Modification |
$89,852 |
Shelby Energy Plant #4 & #5 Rebuild |
$178,483 |
Smith Hall 205 Renovation |
$77,196 |
Student Rec Center Chiller Replacement |
$268,431 |
Town Center Exterior Enhancements |
$98,506 |
University Medical Center Chiller Replacement |
$92,530 |
Total |
$3,051,801 |
2017-18
|
600 Building Suite C Renovation |
$28,954 |
ACDP FY17 Electrical Distribution Replacement |
$223,128 |
Bevill 0056 |
$32,321 |
Bevill Renovation of Rm 0027 |
$39,659 |
Brewer Porch Bldg. #132 Floor Project |
$67,709 |
Bryant Conference Center Registration Lobby |
$35,881 |
CCHS University Medical Center Purchasing |
$22,742 |
FY 2017 ACDP Elevator Controller Replacements |
$21,387 |
FY17 Annual Building Envelope Restorations |
$182,500 |
FY17 Annual Building Restorations |
$398,733 |
FY17 Annual Campus Boiler Upgrades |
$245,023 |
FY17 Annual Campus HVAC Controls Upgrade |
$193,140 |
FY17 Annual Campus Lighting |
$82,636 |
Gallalee Hall Reno. Rm 334-337 |
$72,537 |
Gallalee Hall Tertiary Pump Installation |
$26,668 |
2017-18 (continued) |
Cost |
Law School Chiller Replacement |
$129,375 |
Little Hall Mechanical Room Modifications |
$37,785 |
NERC Replace Transformer |
$27,259 |
Nott Hall Tertiary Pump Installation |
$21,085 |
Reese Phifer Hall Renovation of Room 338 |
$94,911 |
Rodgers Library Tertiary Pump Installation |
$21,657 |
Rose Admin Renovations for Strategic Communications |
$125,732 |
Rose Admin Special Events Renov. |
$197,797 |
Rose Administration Room 120 Renovation |
$27,986 |
SERC Rm 3022 Conversion to Lab |
$35,887 |
SHC Pharmacy Department |
$49,812 |
SHC Reception Desk Renovation |
$40,478 |
Sidewalk Enhancements East of Rose |
$54,704 |
Total |
$2,537,486 |
2016-17
|
390 Tanglewood Drive Miscellaneous Renovations |
$96,250 |
Bevill Energy Bldg Air Compressor R |
$57,631 |
Bevill Hall Ctrl Thermal Hot Water |
$48,278 |
Bidgood Hall Room 231 Renovation |
$99,030 |
Bryant Denny Stadium Renovation to the Presidents Box |
$709,015 |
Bryant Res Hall HVAC Unit Rep-close |
$100,217 |
Elevator Safety Code Compliance Upgrades |
$127,809 |
Garland Hall Room 102 & 103 |
$43,754 |
Manderson Landing Landscaping & Bollards |
$25,330 |
Mary Harmon Bryan Hall UPS Replacement |
$36,103 |
Moody Music Building Chiller Replacement |
$89,299 |
Morgan Hall Storm Sewer Repair |
$36,674 |
NE Medical Building Wing C Roof Coating |
$55,977 |
NERC Research Lab 1046 Modification |
$31,911 |
Rose Admin Lobby Conf Rm 151 |
$22,788 |
Rose Admin. Renov. for the Office of the Counsel |
$39,156 |
Rose Administration President's Board Room Renovation |
$30,155 |
Sewell Thomas Hall of Fame Fit Out Millwork |
$147,398 |
SHC Carpet and Paint |
$53,895 |
Shelby Hall Hot Water Sys |
$104,694 |
Student Rec Center Repair Hot Water System |
$34,808 |
Student Rec Ctr Pool Strainer Repl |
$51,992 |
West Campus & Gorgas Electrical Distribution |
$279,239 |
Total |
$2,321,405 |
2015-16
|
401 Queen City Avenue Renovation |
$752,440 |
Arboretum Building Renovation |
$50,104 |
Bryant Conference Center Sellers Lobby |
$52,634 |
Capital Hall (Community Affairs) Phase 2 |
$303,897 |
2015-16 (continued) |
Cost |
Capstone College of Nursing Breakroom |
$30,171 |
Clark Hall Replacement of Fan Coils |
$32,216 |
Friedman Hall Chiller Replacement |
$64,576 |
Hardaway 255 & 256 Classroom |
$252,703 |
Hardaway Hall Rooms 164, 165A, & 165B" $160,534
|
Jessup Building |
$188,156 |
Law Center Elevator Repair of Hydraulic Lines |
$37,560 |
Martha Parham West First Floor Miscellaneous Finish |
$62,783 |
Nott Hall Renovation of Rooms 281 & 282 |
$117,290 |
Reese Phifer 336 Renovation Teaching Lab |
$65,379 |
Reese Phifer Replace three 500KVA MV Trans |
$43,492 |
Reese Phifer Renovation Room 341 |
$79,460 |
Rose Admin. Renovation of Interior Office |
$118,121 |
Rose Admin. Renovation of Miscellaneous Rooms |
$32,577 |
Rose Admin. Renovation of Provost Area Conference Room |
$95,639 |
Rose Admin. Interior Renovation of Rooms 365A & 365B |
$26,729 |
Shelby Hall Air Compressor Replacement |
$50,781 |
Student Health Center Lobby |
$32,062 |
Total |
$2,649,304 |
2014-15
|
1818 University Blvd. Renovation |
$76,756 |
Barnwell Hall Chiller Replacement |
$40,528 |
BB Comer ELI Classrooms Painting & Flooring |
$43,061 |
Bidgood Hall 201 |
$29,248 |
Bidgood Hall Renovation of Room 304 and 004 |
$113,298 |
Carmichael Hall Rotunda Rm. 311 Sound Mitigation and Remodel |
$25,882 |
Garland Hall 301 & 302 Renovation to Faculty Offices |
$21,942 |
Gordon Palmer Landscape and Irrigation |
$45,701 |
Hardaway Hall Research Lab Rm. 111 & 112 |
$33,881 |
Mary Burke East Office 132 Modification |
$24,016 |
Mary Harmon Bryant Repair of York Chiller |
$28,793 |
Math Office Renovation of GP Room 345 |
$34,747 |
McLure Library Rooftop Air Handler Replacement |
$37,117 |
Paty Hall Renovation of Room 102 |
$22,470 |
Phi Kappa Psi Installation of Stairwell |
$27,300 |
Re-Configure and replace Existing Sidewalks |
$84,957 |
Reese Phifer Cooling Tower Replacement |
$38,977 |
Reese Phifer Hall Classroom 226 |
$29,022 |
Rose Admin. Renovation of the Office of Financial Affairs |
$363,317 |
Rose Administration Basement |
$122,746 |
Rose Administration Conference Room 303H |
$29,085 |
Rose Administration Interior Renovation Room 201/202 |
$56,295 |
Rose Administration Interior Renovation of Academic Affairs Office Space |
$21,404 |
School of Medicine Rooftop AHU Replacement |
$93,043 |
Shelby Hall Boiler Number 2 Repair |
$30,744 |
2014-15 (continued) |
Cost |
Suite A 600 University Blvd. East Interior Renovation for Public Safety |
$121,238 |
University Medical Center New Chiller Installation |
$184,670 |
Total |
$1,780,241 |
2013-14
|
Athletic Central Energy Plant Repairs |
$35,695 |
Clark Hall Reno of 1st Floor Bathrooms |
$41,066 |
Hackberry Park Enhancement |
$132,716 |
HM Comer Heat Exchanger Replacement |
$37,791 |
Jones Archaeological Museum Replacement of RTU |
$10,378 |
Law Center Elevator Repairs |
$49,993 |
Law Center Sidewalk and Fencing |
$48,931 |
Mary Harmon Bryant Repair of 100 HP Boiler |
$47,663 |
McMillian Building - Boiler Replacement |
$72,601 |
Misc. Improvements to Denny Chimes Area |
$13,726 |
Misc.. Campus Infrastructure Projects |
$211,523 |
Moody Music & 2nd Ave Pedestrian Walkway |
$15,605 |
Moody Music Compressor Replacement |
$19,065 |
Osband Hall Renovation of 1st Floor and Break Room |
$14,008 |
Relocation of Bevill Chiller to AIME |
$51,230 |
Renovation of Former Sigma Chi House |
$115,809 |
Renovation of Room 332 Reese Phifer |
$28,291 |
Rose Admin Electrical Switchgear Replacement |
$94,128 |
Rose Administration Renovation of Room G72 |
$17,514 |
Rose Administration Tenant Improvements |
$94,369 |
Shelby Energy Landscape/Parking Lot Enhancements |
$13,436 |
Smith Hall Renovation of Room 200 |
$83,342 |
UA Banner Replacement |
$14,806 |
University Blvd Security Fence |
$322,631 |
Total |
$1,586,315 |
2012-13
|
2010 Handicap Accessibility Upgrade |
$400,144 |
BB Comer, Morgan Hall, Rowand Johnson, ten Hoor Multi-Media Suites" $34,801
|
Bicycle Rack Installation |
$148,200 |
Bidgood Hall Reconfigure Room 103 |
$15,776 |
Bidgood Hall Reconfigure Room 104 |
$44,004 |
Bryant Museum Renovation to Exhibits |
$44,180 |
FY13 Annual Bldg. Envelop Restoration |
$292,251 |
Law Center - Classroom Renovation |
$432,257 |
Mixed Use Trail at Sam Bailey Track |
$42,130 |
Phi Kappa Psi-Install of Stairwell |
$24,709 |
Renovation ACT Space for Student Receivables |
$338,045 |
Rose Admin Tenant Improvement Office of University Counselor |
$29,825 |
University Medical Center Compressor |
$19,279 |
Total |
$1,865,601 |
2011-12
|
Annual Campus Lighting |
$19,702 |
Aquatic Center Mechanical Piping Women |
$20,303 |
Bevill Building Replace RTU Clean Room |
$76,668 |
Bryant Conference Center Boiler Repairs |
$20,526 |
Bryant Conference Center Chiller |
$69,850 |
Bryant Drive Supe Store Renovations |
$33,980 |
Buildings Around Quad Up Lighting |
$21,170 |
Capstone Village Garden Center |
$40,370 |
Capstone Village GH 684 |
$47,270 |
Doster 1st Floor Ceiling Tile |
$23,979 |
Doster Hall Envelope Restoration |
$53,690 |
Doster Hall Room 304 Renovation |
$34,710 |
Facilities Administration Chiller Replacement |
$72,481 |
Farrah Hall Geography Office Suite |
$19,841 |
Gorgas House Landscaping Improvements |
$29,934 |
Harris Hall Chiller Replacement |
$49,358 |
Hillel House Renovation for Community |
$57,000 |
Law Center Sidewalk and Fencing |
$22,193 |
Martha Parham Carpet Replacement |
$30,177 |
Modernize HVAC Controls |
$74,520 |
Moody Music Building Boiler Repair |
$119,005 |
Nott Hall Annex Window Replacement |
$44,094 |
Rose Administration Exterior Restorations |
$59,105 |
Rose Administration G69/G303 Improvements |
$30,128 |
Temporary Chillers-C&BA Energy Plant |
$1,306,148 |
University Club Boiler & Misc. Repairs |
$74,545 |
Total |
$2,450,747 |
2010-11
|
700 University Boulevard East |
$34,067 |
Alumni Hall Landscaping & Signage |
$10,836 |
Ancillary Services Building (Convert Workroom to Office Suite) |
$21,893 |
Ancillary Services Building (Suite 102 Build out) |
$52,288 |
BB Comer Window Replacement |
$42,361 |
Bryant Museum Display Cases |
$28,378 |
Capstone Village Upgrades 600 |
$32,680 |
Capstone Village Upgrades 605 |
$24,988 |
Capstone Village Upgrades 607 |
$29,484 |
Capstone Village Upgrades 608 |
$5,000 |
Capstone Village Upgrades 610 |
$10,339 |
Capstone Village Upgrades 615 |
$29,529 |
Capstone Village Upgrades 679 |
$29,162 |
Doster Hall 108 Kitchen Modification |
$14,126 |
Gordon Palmer Room 301/302 Finishes |
$23,864 |
Gorgas Library Chiller Replacement |
$199,358 |
Gorgas Library Resource Center/Emerging Technologies |
$81,435 |
Gorgas Library Room 542 Renovation |
$27,110 |
KA-PKA Green Space Improvements |
$87,997 |
Little Hall 1st Floor Restroom |
$51,937 |
Marr's Pond Cistern Renovation |
$55,520 |
Martha Parham A/V Classrooms |
$66,196 |
New Hall Redundancy in Dispatch |
$129,075 |
Nott Hall Boiler Upgrade |
$22,453 |
President's Mansion 3rd Floor HVAC |
$102,451 |
Quad Security Cameras |
$28,568 |
Quad Up Lighting |
$77,483 |
Rose Administration Building Re-configure for Advancement |
$64,364 |
Smith Hall Restoration |
$199,358 |
Student Service Center, Room 206" $35,735
|
Tutwiler Hall Community Directors Suite Exterior Door Security |
$23,851 |
Tutwiler Hall Community Directors Suite |
$140,946 |
Woods Hall Room 209 Renovation |
$51,688 |
Total |
$1,834,520 |
2009-10
|
Bidgood Hall Paint Corridors |
$31,640 |
Campus Sidewalk Repair |
$250,000 |
Ferguson Center Additional Bicycle Racks |
$49,520 |
Galilee Hall Restroom Renovations |
$61,000 |
Gallalee Hall Finish Upgrades |
$87,000 |
Gordon Palmer Rooftop Chiller Replacement |
$290,000 |
Gorgas Library 5th Floor Finishes |
$36,769 |
Gorgas Library Chiller Replacement |
$200,000 |
Gorgas Library Resource Center |
$102,582 |
Hardaway Hall Chiller Replacement |
$229,050 |
Heat Plant Boiler Burner Controls |
$171,962 |
Little Hall 1st Floor Restroom Renovation |
$35,000 |
Mal Moore Athletic Building (Heisman Trophy) |
$58,000 |
Manly Hall Misc. Room Renovations |
$31,106 |
Marr's Pond Repair Cistern |
$57,000 |
Mary Burke Upgrade Chilled Water |
$39,200 |
New Hall Building Envelope Refurbish |
$31,700 |
Nott Hall Boiler Upgrade |
$85,093 |
President's Mansion Chiller Replace |
$45,413 |
Smith Hall Restroom Renovation |
$200,700 |
Tutwiler Hall - Julia C Store Addition |
$39,200 |
Woods Hall Room 209 Renovation |
$74,766 |
Total |
$2,206,701 |
Ten-Year Total |
$22,284,122 |